City of Melville. Click to make a call our toll free number. Search

Myaree Business Area Master Plan

Myaree Business Area Master Plan

Open

Planning a stronger future for Myaree Business Area

Last Updated: 3 November 2025 Follow Engagement

The City of Melville has prepared a draft Master Plan for the Myaree Business Area (MBA). This draft sets a long-term vision to guide growth, investment, and improvements, ensuring the MBA remains vibrant, sustainable, and competitive into the future.

Although the MBA is one of three major economic centres in the City, it is not identified as a District Centre under State Planning Policy 4.2 and therefore does not require an Activity Centre Plan. This has provided the opportunity to prepare a strategic document unconstrained by statutory obligations, focused instead on the City’s priorities and community aspirations.

Draft MBA Master Plan

The draft MBA Master Plan represents a high-level strategic review of the area, examining its current status, challenges, and opportunities. It seeks to refine a vision for the future and put in place the building blocks to maintain and support the MBA, reflecting its importance to the ongoing prosperity of both the community and the City of Melville.

Read draft MBA Master Plan

The master planning process has considered a number of focus areas, outcomes, actions, and recommendations to support this vision, with an initial focus on:

  • Local Centres (Hulme Court and Marshall Road)
  • ​Public realm
  • Traffic and car parking
  • Land use
  • Interface with adjoining areas
  • Infrastructure
  • Branding

About the area

The MBA is centrally located in the suburb Myaree and the northern side of Leach Highway and on both sides of North Lake Road. The majority is sited between Marmion Street and Leach Highway, though the north-eastern portion extends to the north of Marmion Street.

The area is approximately 87 hectares in size and is currently zoned “Mixed Business” in the Local Planning Scheme 6, with the exception of two locations centred on Hulme Court and Marshall Road respectively which are zoned the“Local Centre”. 

It is serviced by three regional roads - Leach Highway, North Lake Road and Marmion Street, effectively dividing it into three major cells west of North Lake Road (appx. 24ha), east of North Lake Road and south of Marmion Street (appx. 51ha) and north of Marmion Street (appx. 12ha). The southern boundary of the MBA is established by another major regional road in Leach Highway. Two local distributor roads being Rome and Norma Roads also service the MBA. 

Opportunities to get involved

Any comments you wish to make on the draft MBA Master Plan are to be submitted by 4.00pm Monday, 24 November 2025 by one of the following:

  • Online, using the submission form below
  • In writing to the City of Melville, locked Bag 1, Booragoon WA quoting reference: MBAMasterPlan
  • Delivered in person at 10 Almondbury Road, Booragoon.
Primary interest:








Involvement in this project:

Level of support:



Max 500 characters with spaces
Max 4MB
What is the aim of this project?
The Master Plan aims to address issues and challenges affecting the area and establish a long-term vision to sustain its core role as a significant place of business and economic investment within the City.

Outcomes from this engagement will also assist in the Local Planning Scheme 6 review process. 
More about the Myaree Business Area
The MBA has evolved since the late 1960s from initially a traditional industrial function into a much wider commercial and business area, and the place with the largest economic and business footprint within the City.
  1. Development of the MBA started to occur by the early 1960s, with establishment of some industrial development having commenced within all MBA cells by 1965. By the turn of the century the MBA was fully built out (with the exception of one or two isolated lots). Since then, redevelopment of individual sites within the MBA has continued.
  2. Development of the MBA has occurred over the course of four town planning schemes (TSPs) dating from the 1970s. Throughout TPS 2, TPS 3 and TPS 5, the MBA has generally been designated as some form of industrial zoning.
  3. Under TPS 3, two industrial zones named “Industrial 1” and “Industrial 2” were introduced. The two zones were intended to promote development of lighter/service industrial uses adjacent to surrounding residential areas as a buffer to heavier industrial uses, more centrally located within the MBA. The “Industrial 2” zone, intended to encourage lighter/service industry, was only designated along the Leach Highway frontage, meaning heavier industrial uses were not discouraged, directly abutting residential zoned land on the western and northern boundaries of the MBA.
  4. Under TSP 5, the MBA was zoned “Mixed Business”  in reflection of the evolving nature of the MBA. The MBA was split into two precincts being the “Myaree Business” precinct and the “Myaree Business Frame” precinct. The “Myaree Business Frame” precinct, as per the “Industrial 2” zone under preceding TSP 3, was intended to facilitate development of uses considered more compatible with adjoining residential areas as a buffer between them and the remainder of the MBA.
  5. Generally, the “Mixed Business” zone limited the range and nature of industrial activity permissible within the MBA. It also located the “Mixed Business Frame” to along the western and northern edge of the MBA, where it directly abuts residential areas rather than along Leach Highway where the “Industrial 2” zone was located under Scheme 3. The area originally identified as “Industrial 2” in Scheme 3 was incorporated within the general “Myaree Business” precinct rather than the frame precinct.
  6. Scheme 5 was amended to rezone the Hulme Court and Marshall Road locations as “Commercial Centres” in reflection of the nature of the predominant uses at these locations. The balance of the MBA remained “Mixed Business”.
Myaree Business Area land use
The total MBA is in the order of 87ha in area. This includes road reservations. Zoned land comprises 72.432ha of which 67.638ha is zoned “Service Commercial” and 4.793ha is zoned “Centre C4”. The Centre zoned portion comprises the two local centres; Hulme Court (2.397ha) and Marshall Road (2.396ha).


A total of 222 lots (not including strata titles) are sited within the MBA. These comprise a diverse range of lot sizes with 28 lots (12.7%) under 1000m2, 107 lots (48.1%) between 1000 and 2500m2, 58 lots (26.2%) between 2500 and 5000m2, 16 lots (7.2%) between 5000m2 and 1ha and 13 lots (5.8%) greater than 1ha in area.

Six lots (not including strata titles) ranging in size from 1425m2 to 5118m2 comprise the Hulme Court Local Centre, and three lots ranging from 5182m2 to 1.3597ha comprise the Marshall Road Local Centre. All other lots are within the “service Commercial” zoned portion of the MBA.

Built form is very diverse across the MBA, ranging from very substantial buildings to small premises, and include modern stylish architecturally designed facilities ranging to historic run down industrial premises.
About the engagement

In 2023, the City formed a Stakeholder Reference Group (SRG) made up of business owners, property owners, and nearby residents. Their input was central in identifying key issues, opportunities, and a vision that informed the draft Master Plan.

Now, in 2025, we have reached the final stage of engagement. This is your chance to review the draft Master Plan – including the proposed vision, focus areas, and priority actions – and provide feedback before it is finalised and presented to Council.

Privacy

We collect basic demographic details (such as suburb, gender, and age) to help ensure feedback reflects the diversity of the Myaree community. Your personal information will remain confidential and will never be shared publicly or with third parties.

Who is the final decision maker
The Council of the City of Melville will be the final decision-maker. A report, including a summary of submissions and an officer recommendation, is expected to be presented for consideration at an Ordinary Meeting of Council in early 2026.

Social Media Share this pageLinks below open in a new window