21 May 2026

Council endorsed progressing the Leeming Recreation Centre project to a detailed Feasibility Study, with $100,000 allocated in the draft 2026/27 Budget.

At the May 2026 Ordinary Meeting of Council, Council resolved to:

  1. Receives the Leeming Recreation Centre – Pre-Feasibility Study (Attachment 1);
  2. Notes the Leeming Recreation Centre – Needs Analysis (Attachment 2); and
  3. Allocates $100,000 in the draft 2026/27 Annual Budget to undertake a detailed Feasibility Study focused on Option 4 – Demolish and Rebuild, including further investigation of redevelopment on the existing site or an alternative location within the precinct;
  4. Notes that the detailed Feasibility Study is to include (but not be limited to):
    • Wider community engagement and consultation;
    • Ongoing collaboration with the Department of Education and Leeming Senior High School in parallel with their business case process;
    • Confirmation of the preferred location within the precinct;
    • Confirmation of the facility scope and required supporting works;
    • Preparation of a concept design and site master plan;
    • Detailed capital, lifecycle and operational cost modelling;
    • Financial sustainability and funding pathway assessment;
  5. Requests the Chief Executive Officer to update the relevant State and Federal Members of Parliament on the project.