Road Works - City of Melville 2018-19

Find out about current road works across the City, including new roads, road widening, resurfacing, sweeping, crack sealing, footpaths, signage and stormwater works.

If you have general enquiries regarding road works, please call 9364 0666. For enquiries relating to specific works, please contact the relevant responsible officer listed below. 

Civil Construction Road Works

The responsible officer for civil construction road works is the Construction Supervisor, Michael Powell 9364 0728.

LocationDescriptionStatus
Len Shearer Reserve Car Park Drainage Improvments, Booragoon

Works to improve stormwater run-off on the western side of the car park commenced 20 June and will involve kerbing installation and the construction of water sensitive swales.

Works are expected to take 4-5 weeks to complete.  

Awaiting planting of sedge species to swales.

 

Stock Road and McLean Street, Melville

Roadworks on Stock Road at McLean Street, Melville commenced 22 August 2018.

Works will be generally be undertaken on eastern side of Stock Road either side of McLean Street to facilitate the installation of a wider pedestrian refuge island on Stock Road and are expected to take 3-4 weeks to complete.

Works are expected to take 3-4 weeks to complete.

Awaiting faux paving and installation of signs and pavement markings by MRWA.

 

Murdoch Path Shared Path Stage 2B (Sutherland Crescent to Somerville Boulevard), Winthrop

Works commenced on September 11 on the continuation of the new Murdoch Drive shared path with this stage to be constructed through to Somerville Boulevard. Future stages will eventually connect to South Street.  Works are expected to take 4-5 weeks to complete.

Works commenced on September 11 on the continuation of the new Murdoch Drive shared path with this stage to be constructed through to Somerville Boulevard. Future stages will eventually connect to South Street.  Works are expected to take 4-5 weeks to complete.

 

Box out completed. Limestone retaining wall installation commenced 18 September.

 

Road Resurfacing

Responsible Officer: Road Resurfacing Program Supervisor, Iuliana Anton 9364 0783.

View the Road Rehabilitation Program for 2018-2019 for a full list of planned works.

LocationDescription & Status
McKimmie Road, Palmyra

The project will consist of civil, profiling and asphalting works from Marmion Street to Canning Highway.

Civil works commenced 24 July and include upgrades to drainage structures, footpaths, crossover aprons, kerbing and pedestrian ramps.

Concrete and drainage works completed. Tactile ground surface indicators installation to follow. Asphalt works scheduled for completion during the September school holiday period.

Aitken Drive, Winthrop

The project will consist of civil, profiling and asphalting works from Winthrop Drive roundabout to Hackett Pass (South section).

Civil works commenced 9 August.

Footpath works completed. Drainage works in progress between Freedman Way and Winthrop Drive roundabout. Kerbing and concrete works to follow at Aitken Drive and Winthrop Drive roundabout.

Freeth Court, Brentwood

The project will consist of civil, profiling and asphalting works.

Civil works commenced 13 September and include upgrades to drainage structures, crossover aprons, kerbing and pedestrian ramps.

Kerbing and drainage works near completion. Footpath and crossover aprons in progress. Asphalt overlay scheduled for early October.

Patterson Avenue, Kardinya (between South Street and Hadley Gardens)

The project will consist of civil, profiling and asphalting works.

Civil works are scheduled to commence early October and include upgrades to drainage structures, crossover aprons, kerbing and pedestrian ramps.

North Lake Road Southbound, Winthrop (Leach Highway to Somerville Boulevard)

The project will consist of civil, profiling and asphalting works.

Due to high volumes of traffic and proximity to Leach Highway, the asphalt works can only be completed at night between 7.00pm and 5.00am. The asphalt works consist in milling out existing asphalt layers and reconstruct the pavement in two layers of asphalt, which will be achieved in two visits, one for the bottom layer (7 to 14 October) and one for the wearing course (12 to 13 November).

Civil works are scheduled to commence mid-October, after the completion of the bottom layer of asphalt, and include upgrades to drainage structures, kerbing, pedestrian ramps and cut-throughs.

Murdoch Drive Southbound, Bateman (Leach Highway to Grave Pass and Marsengo Road to South Street)

The project will consist of civil, profiling and asphalting works.

Due to high volumes of traffic and proximity to Leach Highway, the asphalt works and some of the civil works can only be completed at night between 7.00pm and 6.00am. The asphalt works consist in milling out existing asphalt and reconstruct the pavement in two layers of asphalt, which will be achieved in two visits, one for the bottom layer (15 to 17 October) and one for the wearing course (13 November).

Civil works are scheduled to commence late October, after the completion of the bottom layer of asphalt, and include upgrades to drainage structures, kerbing, pedestrian ramps and cut-throughs.

Road Sweeping

Responsible Officer: Road Resurfacing Program Supervisor, Iuliana Anton 9364 0783

The City is currently sweeping roads in Ardross and Bicton.

Crack Sealing

Responsible Officer: Technical Officer Works Services, Iuliana Anton 9364 0783

The program is progressing depending on the weather conditions.

Current status: 90% complete.

Verge Infrastructure

Responsible Officer: Verge Infrastructure Supervisor, Bryce Hunt 9364 0682

Footpath Works

Location Status
Moonlight Cove, BrentwoodConstruct linking path to boardwalk and provide like to Spinaway Crescent. In progress.
Selway Road - Cambey Way to Moolyeen Road

Construct new path.

In progress.

Adams Street - Dean Road to Mandala Crescent

Renew path and reposition to kerbline.

In progress.

 

Signs

Responsible Officer: Verge Infrastructure Supervisor, Bryce Hunt 9364 0682

Current signage works:

Attadale Sign Replacement Program, 61% complete.

Civil Assets Maintenance

Responsible Officer: Civil Assets Maintenance Supervisor, Bradly Prideaux 9364 0734

Storm Water and Drainage

Responsible Officer: Civil Assets Maintenance Supervisor, Bradly Prideaux 9364 0734

Type of WorksDescription & LocationStatus
Storm Water Pit Cleaning

Hydro-jetting of pipes

 

Jetting of pipes at the intersection of Canning Highway and North Lake Road scheduled to commence 27 September.

 Pit Cleaning

Planned mechanical vacuuming of stormwater pits:

Booragoon - Estimated completion date 20 September

Attadale - Commenced 3 September, to date 147 pits have been cleaned.

Applecross - Complete.  513 pits cleaned.